Illumination of the cavern in the Lötschberg base tunnel
with the StreamLED 2

 

Light as bright as day to make the work easier

The Lötschberg base tunnel had to be temporarily closed because an unexpected ingress of water washed sand into the eastern tube. A cavern is being built outside the tunnel tube to prevent further ingress of water and sand into the area of the railway. The StreamLED 2 was delivered and installed in a very short time, so that the cavern is now adequately illuminated. 

Project details

 
Customer/installation engineer: BLS Netz AG
Electrical engineer: eprotraffic GmbH
Requirement: BLS Lötschberg base tunnel, karst water cavern
Solution: StreamLED 2 60 230VAC
Item no.: 860671
Quantity: 100
Areas of application: Tunnel, access gallery, power station, sewage treatment plants

Customer benefits

  • easy and quick installation
  • the glare is reduced to the minimum by turning the pipe.
  • less power consumption at very high utilization ratio
  • immediate full luminous flux
  • minimal temperatures progression
  • Insensible against shocks and vibrations

Matching products

Downloads

Technical lights

Main catalog

The advantages at a glance

 

High-quality innovations with a sustainable claim

 

 

Safety guarantee

Various ISO-certified processes ensure that GIFAS products and services meet the highest standards.

 

All-round carefree package

We support you from the initial idea through to the concrete development and installation work.

 

Individual solutions

Our specialist staff will work with you to develop individual solutions for specific needs and different locations.